feb 26, 2021
In 2019, Veltec Industrial Services carried out a major shutdown at Equinor Mongstad in Norway. The duration was 25 weeks with a staff of 504 people, a total of 1,310 job packages, and with a turnover of 189 million. dk. The shutdown work consisted of mechanical work...
des 22, 2020
In 2018 Veltec was awarded an EPCI contract for building of a new Vapor Recovery unit (VRU) plant for 4 quays at the Mongstad Refinery. The project had size of 200mill NOK, and Veltec was responsible for electrical, automation, mechanical and iso-disciplines, as well...
okt 29, 2020
In 2019, Veltec Industrial Services built a 19,200 m³ steel storage tank, according to API-650 and Equinor specifications. The project consisted of engineering, design, construction, procurement, manufacture and the construction of a 19,200 m³ fixed...